Project Profiles

Entries for 'step2011'

A Phase II ESA was completed under the City of Flint’s EPA Site Assessment Grant that consisted of a geophysical survey over interior and exterior areas of the subject property, the advancement of 25 soil borings to collect soil and water samples at the RECs, and test pitting to investigation anomalies consistent with the presence of orphan USTs. 

Posted in: North Region

The City of Chattanooga, Tennessee was awarded EPA Assessment Revolving Loan Fund (RLF) and Cleanup grants.  PM Environmental, Inc. (PME) responded to a Request for Qualifications from the City of Chattanooga and made the shortlist of 10 firms to interview. 

Posted in: Mid-South Region

PME completed all mitigation, investigation and installation of a multi well recovery network over five acres as part of the corrective action system within a 18 month period.  The remediation system has had a 96% uptime and has mitigated most of the free phase hydrocarbon (fph). 

Posted in: Mid-South Region

PM Environmental, Inc.’s (PME) client is a 550 unit retail gasoline station and convenience store operator with locations in Tennessee, Kentucky, Virginia, Georgia, Alabama, Mississippi, Louisiana, and Arkansas. The majority of their locations are in Tennessee and Alabama where PME is the Corrective Action Contractor (CAC).

Posted in: Mid-South Region