CALL TOLL FREE 1-800-313-2966
 

Phase II Environmental Site Assessments, Vapor Intrusion Assessments:

PM Environmental is experienced in designing and completing Phase II Environmental Site Assessments (ESAs) in accordance with the American Society for Testing and Materials (ASTM) Standard for Environmental Site Assessments: Phase II Environmental Site Assessment Process, State and Federal requirements and customized to meet client needs and budgets. PME has completed thousands of Phase II ESAs at all types of sites and geologic settings and tested for variety of contaminants.

Prior to implementing a Phase II ESA, PM Environmental makes sure to understand the goals of the client and project. The scope of work is designed to meet the scrutiny of the various parties involved including lenders, regulators, attorneys and peers.

PM Environmental owns and operates several Geoprobe® drill rigs and completes its own field services which allows for control of scheduling and costs.

Site Characterization and Assessment

Soil Boring Installation
Monitoring Well Installation
Vapor Intrusion Assessments
Sampling of Soil, Groundwater, Sediments, Surface water, and Air
Geophysical Evaluations including Ground Penetrating Radar (GPR)
Risk Based Corrective Action (RBCA)
Receptor Surveys
Contaminant Pathway Evaluations
Fate and Transport Evaluations
Risk Assessments and Modeling
Natural Attenuation and Biodegradation Modeling
Quality Assurance/Quality Control

Get a Quote

 

 

 

 

home        services         our professionals         locations        project profiles         news         jobs        resources